Friday, March 29, 2013


Yesterday evening they finished installing the kitchen cabinets.  We were told that one of the doors to the corner cabinet (the one with the lazy Susan in it) was on backorder.  It is supposed to arrive April 2nd.  The installer told us that when he returns to install the doors to the cabinet he can also install all the drawer and cabinet pulls (knobs) for free.  He said it was part of their service.
Janice called the counter top folks this morning.  They will drop by on April 2nd to measure so they can cut our counter top.  They'll also measure the sink we bought to cut it out as well.  Janice wants an undercounter mount in the kitchen.
Everything will be happening April 2nd.  The cabinet guy returns and all the appliances will be arriving.

The sink is under the window.  To the right of it
will be the dishwasher.  There is a thin cabinet for
her cookie sheets and things like that.  To the right
of the thin cabinet is the refrigerator space.

The space is for the Range and Oven and above it
the range hood and microwave oven.

This kitchen won't tire Janice out.  I look at it
and try to imagine a rectangular table with four
chairs in the kitchen area.  I can't wait for
the appliances to arrive on April 2nd.

No comments:

Post a Comment