I didn't get a chance to take pictures today. I'll do it tomorrow. The framing/plumbing contractors came by yesterday and installed the tub in No. 2 bathroom. They also installed the shower heads and faucets in both bathrooms. They installed the attic stairs that will open onto the carport. I needed this in order to blow the attic insulation and for the installation of the lights over the carport.
The tape and float guys arrived this morning and finished a second float on the joints and installed all the rounds on all the corners. It looks fantastic.
Tomorrow I'll take and download some pictures.
No comments:
Post a Comment