Yesterday I received the bids for the bathroom counter tops with sinks. It was a real good bid. I paid for half and told them to go forward. She told me it would take a week.
Today the guy that installed the kitchen counters returned. He had been down with the flu. They kept cancelling his scheduled time to finish the installation. He installed the doors to the lazy Susan (one had been back ordered) and all the knobs and drawer pulls. It looks pretty good.
I also had a painting contractor come by today. He walked the inside of the house and gave me a bid. His bid was about $4500.00 less than the first bid I got. I have one more painting bid to go.
No comments:
Post a Comment