Sunday, July 29, 2012

The water lines are almost finished.  There are still a few that need to be done.  Chris Cantwell, the plumbing, electrical, and framing contractor told me that he's going to install a manifold to combine several lines.  Right now I'm going to check on the required diameter for the toilet vent pipes.  I'm also going to check on the water lines.  They look to me to be PEX tubing but I need to be sure.  I have 1/2 inch lines coming in and a 3/4 inch line.  I'm thinking the 3/4 inch is for the manifold or water heater.

Jonathan and Silvia left this morning along with Mika.  They were here testing food for their wedding reception (less Mika, she would have liked any food).  I think they got a good caterer.