Thursday, December 27, 2012


The trenching contractor is here today covering some of the trenches he dug this past Saturday and Sunday.  He glued and installed the water line on Sunday so he's covering it today.  Still to go is the sewer line, gas (propane) line, and the electric line going to the shed in back.  Janice and I are waiting for AT&T to come fix a cut land line wire.  They trenched across it.  We've been using our cell phone to communicate but it's difficult getting a signal out here.
 
The insulation is up on the walls.  This is looking
towards the Kitchen and Formal Dining.  The window on
the right is over the kitchen sink.  The framed area
without insulation is the pantry.

Looking down the Sewer line trench (I'm standing over the Septic Tank). 
To the left are the trenches for the gas line and electric line going to the shed. 
The water line is not visible.