Yesterday we received an email to tell us the shell (outside) was finished.  Janice and I walked around taking notes and found a few problem areas.  I called the framing boss and he came by to see the areas that either needed repair or replacement.  The outer edge of the decking on the porch will be finished after the sheetrock is installed.  It looks pretty good overall.  Now we move inside.  The electricians are still working and the HVAC person came by to plan his installation.  The plumbing looks good but I'm still concerned about the Master Bath shower.  It is really a custom job. 
Well, so far so good.

The Front Elevation as built.

The Front elevation as designed. 
The 3 foot by 5 foot windows became
3 feet by 6 feet for egress and the porch
posts were spaced 8 feet instead of the designed 10 feet.
All in all, pretty good.
 